The following questions appeared in Osmania University (OU) examinations


  • What are the various sources of water (3)
  • Discuss briefly the importance of treating water for public supply (2)
  • Write about breakpoint chlorination. (3)
  • Explain the importance of chemical and bacteriological analysis of water used for domestic purpose (2)
  • Explain the terms: BOD, COD & TOC (3)
  • What are the factors effecting storm sewage (2)
  • What do you understand by preliminary treatment of sewage? Enumerate the various unit operations involved in preliminary treatment of sewage (3)
  • Describe the various methods used for aeration in the activate sludge process (2)
  • Describe the components of a septic tank with the aid of sketch (2)
  • What are the methods of collection of solid waste? (3)
  • Predict future population by incremental increase method (5)
  • Water distribution system & solution to pipe network problem using hardy cross method (5)
  • Design of sedimentation tank problem (5)
  • Rapid sand filters and slow sand filters (5)
  • Sewer problems - calculate velocity and discharge when running full and partially full (5)
  • Velocity of flow in sewers by empirical formulae & detailed steps for the design of sewer (5)
  • Design secondary settling tank problem (5)
  • Preliminary treatment (5)
  • Collection, recovery & disposal of solid refuse (5)
  • Design septic tank (5)
  • Calculation of ultimate BOD (5)
  • Low cost waste treatment using oxidation ponds and RBC (5)
  • Disinfection - necessity and methods (5)
  • Sewer types & appurtenances (5)
  • Sludge dilution & disposal (5)
  • Factors to be considered in planning a water supply scheme for a city (2)
  • Factors affecting rate of demand (2)
  • Impurities to be taken into account while deciding potability of water (2)
  • Slow rate water filter vs fast rate water filter (3)
  • Water distribution systems & advantages of each (2)
  • self-cleansing velocity & limiting velocity in sewers (2)
  • Secondary treatment of sewage and biological treatment techniques (3)
  • Horizontal flow grit chamber & sketch (3)
  • Functioning & design aspects of septic tank (3)
  • Solid waste management (3)
  • Pipe network problem (10)
  • Design of slow sand filter (7)
  • Define flow through period (3)
  • BOD, DO problem (7)
  • Estimating storm water using rational method (3)
  • Design high rate trickling problem (7)
  • sedimentation and its requirement (3)
  • Various types of solid waste and its composition (5)
  • Design a septic tank (5)
  • Ultimate BOD problem (5)
  • Low cost waste treatment methods - oxidation pond and RBC (5)
  • Ultimate BOD, 10 day & 5 day BOD (5)
  • Oxidation pond & RBC (5)
  • sewer types & appurtenances (3)
  • Objectives of Protected Water Supply schemes (2.5)
  • Quality of water from slow and fast sand filters compare & justify (2.5)
  • Limits of turbidity, total hardness and alkalinity in water (2.5)
  • Shapes adopted in sewers - why (2.5)
  • 5 day BOD (2.5)
  • BOD vs COD (2.5)
  • Disposal of sludge (2.5)
  • sketch & explain trickling filter (2.5)
  • Disinfection & various methods of disinfection (2.5)
  • velocity of flow in pipe running full (2.5)
  • Factors affecting per capita consumption of water (3)
  • Quality and quantity of surface and ground water sources (3)
  • Explain hardy cross method - pipe distribution network (4)
  • Design slow sand filter (7)
  • Determination of optimum dosage of coagulant (3)
  • Define BOD, COD, equation of BOD. Effect of temperature on BOD equation and rate constant K. (6)
  • Estimation of storm water by rational method (4)
  • Activated sludge process with diagram (5)
  • Design of grit chamber with sketch (5)
  • Design of septic tank with sketch (6)
  • Sludge digestion process (4)
  • Schematic diagram of a water treatment plant if surface water is source & list objectives of each unit (7)
  • Meaning of low cost waste treatment (3)
  • Construction and maintenance of sewers with salient features like materials used, shape, slope and gradient adopted (6)
  • Standards of potable water (4)
  • Factors affecting population forecasts (3)
  • Design period definition and its value for different components of a water supply scheme (3)
  • Pressure filters - merits & demerits (3)
  • Ozone & UV rays for disinfection; its disadvantages (3)
  • Quantity of storm water using rational method (3)
  • Discuss self-purification of rivers (2)
  • List unit operations in primary treatment & their objectives (2)
  • Role of secondary settling tank in activated sludge process (2)
  • Sketch functioning of oxidation ponds (2)
  • Explain functioning of septic tank with sketch (2)
  • List methods for distribution network analysis & discuss hardy cross method in detail (5)
  • Estimate fire demand of a town using any TWO methods (5)
  • Draw, name & discuss various components of a slow sand filter (6)
  • Design a slow sand filter and discuss effective size and uniformity coefficient of sand particles (4)
  • Important parameters to measure organic content in sewage & significance (6)
  • Determine BOD5 given BOD1 assuming K20 (4)
  • BOD removal in trickling filters with sketch & modifications with flow-diagrams (6)
  • Design a low rate trickling filter (4)
  • MSW, garbage, refuse, bulk waste .... discuss disposal methods (6)
  • Role of secondary settling tank in trickling filter (4)
  • Steps in sludge handling and process in anaerobic digestor (5)
  • Design septic tank (5)
  • Notes on:
    • -Estimation of storm water (2.5)
    • Break-point chlorination (2.5)
    • Taste & Odour control (2.5)
    • Backwash mechanism (2.5)